Hydrodemolition Services
Hydrodemolition has many advantages over conventional mechanical demolition methods.
Typically jackhammers have been used to break concrete from a structure. This can cause microfracturing of the concrete left in place. Extensive cracking and debonding of an overlay can lead to premature failure of bridge decks and similar structures.
Hydrodemolition causes no damage to the structure being rehabilitated and leaves a superior bonding surface.
NATIONAL INFRASTRUCTURE™ hydrodemolition removes thousands of square feet of concrete per day, in a controlled, safe manner. Our patented robotic systems provide the capacity to operate at a very high rate of removal. Conventional methods require a substantially longer timeline for completion.